The short answer
The Condition Improvement Fund is the DfE's bidding round for eligible schools and colleges to fix their buildings. For 2027 to 2028, bids close at midday on 15 December 2026, projects run from £20,000 for primary and £50,000 for secondary up to £4 million, and results are due in May 2027.
If your roof leaks, your boilers are on their last legs or a block is no longer safe to teach in, the Condition Improvement Fund (CIF) may be how you pay for the work. It is run by the Department for Education, and schools and colleges bid for it once a year.
The round for 2027 to 2028 opened in autumn 2026. Here is what you need to know before you start.
When is the deadline?
The deadline is 12 noon on Tuesday 15 December 2026. GOV.UK advises starting your application at least 14 working days before that, so in practice that means starting by the end of November 2026.
The DfE expects to tell schools the outcome in May 2027. That timing matters for refurbishment. If you win, the money arrives in time to order for a summer holiday start, but only just.
How big does the project have to be?
The DfE sets a minimum and a maximum project size. These are the figures for 2027 to 2028:
- Primary schools: at least £20,000
- Secondary schools: at least £50,000
- Any project: up to £4 million
Anything smaller than the minimum isn’t eligible, so small jobs usually have to come from the school’s own budget.
Who can apply?
The usual applicants are stand-alone academies and smaller trusts, plus sixth-form colleges and voluntary aided schools. Larger trusts and councils usually get condition funding a different way.
The rules on who qualifies are set out in the DfE’s guidance on the fund. Check it before you spend time on a bid, because it depends on the size and type of your school or trust.
What does it pay for?
According to GOV.UK, the money is mainly for keeping buildings safe and in working order, with a few expansion projects funded too.
In practice, the strongest bids are about condition and safety: roofs, heating, electrics, fire safety, and buildings that are failing. A refurbishment that is mostly about looks is unlikely to score well. A refurbishment that replaces failing heating, wiring and ceilings in a block is a different story.
How do you get a bid ready?
You need evidence that the problem is real and a credible cost for fixing it. A good bid usually has:
- A condition survey or a specialist report on the problem
- Photographs and a clear description of the risk
- A scope of work and a cost from someone who knows the building
- A realistic programme for when the work would happen
A contractor’s estimate helps make the cost credible. If you’d like one, our school refurbishment contractors page is the place to start.
What if the bid doesn’t succeed?
Many don’t. If yours is turned down, read the feedback and keep the evidence up to date for the next round.
Meanwhile, look at what can be done in phases from your own budget. A smaller first phase this summer can stop a problem getting worse while you bid again.